Since the arrival, the mind has been at work to figure out all that needs to be done. Here's a short list for now:
-Design, build and install mast and spars
-Design rigging for the boat
-Acquire sails and rigging
-Design and install electrical for motor, cabin lights and navigation lights
We're still at the design stages for most. However, this week we'll be working on a prototype for a tabernacle used to step the mast on the boat. We'll keep you posted on its progress.
No comments:
Post a Comment